Florida Apartments - Jacksonville, FL

Facade of the six-story Jacksonville retirement and assisted living building
Project dossier
PropertySix-story retirement and assisted living community, 180 units
LocationJacksonville, Florida
Scope40 vertical cast iron plumbing stacks, 19 in need of rehabilitation
PipeClose to 1,300 LF of cast iron plumbing pipe
ConditionAge, scale build-up and blockages from debris
MethodSewer camera inspection, cleaning, CIPP lining and partial traditional replacement
The property

Known as one of Florida’s finest Retirement and Assisted Living Communities, this property’s commitment to their residents is virtually unsurpassed in the area, coming as no surprise considering it is overseen by a leading property management company.

Creating a higher standard of living for their elderly residents, this property took careful consideration when enlisting a contractor to perform necessary plumbing pipe repairs. Coming in behind previous bidders and delivering a Better Job at a Better Price was Blue Works.

Facade of the six-story Jacksonville retirement and assisted living building

Facade of a residential building.Modern European residential apartment

The work

The six-story building built on grade consisting of 40 vertical cast iron plumbing pipe stacks was experiencing failures due to age of cast iron pipes, scale build-up & some blockages from debris. 19 of these were in dire need of rehabilitation. Between partial traditional replacement methods and CIPP Lining, Blue Works’ crew visually inspected using a sewer camera, cleaned and repaired close to 1,300 LF of plumbing pipes.

Like with any project, there were a few hiccups along the way due to Unknown Conditions and Latent Defects in the Piping Configuration. This allowed the company’s troubleshooting abilities to shine and close out the project with success.

  • Sewer camera inspection of the 40 cast iron stacks
  • 19 stacks identified for rehabilitation
  • Close to 1,300 LF of pipe cleaned and repaired
  • CIPP lining combined with partial traditional replacement
  • Unknown conditions and latent defects worked through
  • Senior residents accommodated throughout
Blue and green pipe fittings with a valve

As you can see by the testimonial below, the customer was pleased with the outcome and would recommend Blue Works to customers alike.

“Nothing short of outstanding!”

“ As the Community Manager, I would like to take this opportunity to thank you for a job well done. Your staff was delightful to work with and it was obvious of their desire to do the job well and work in a professional manner with our staff and residents. In this climate of highly competitive job bidding and contractor selection, choosing the right contractor is paramount.

For the Apartments, using Blue Works was a good decision for many reasons. Your staff and you as the owner were respectful of our senior residents, never lost patience with their higher needs, and were highly accommodating. Not every contractor could have filled that role.

In addition, the lengths that you went to resolve any issues (which are going to happen in a 180 unit building of our age!) was nothing short of outstanding. We appreciate the care you took with our residents and our building. Thank you for your dedication to work well done. “

More project records
Trusted where failure isn't an option.
Blue Works crew in hard hats and fall-protection harnesses at an open drain grate at the FPL industrial drain
Florida nuclear facility

We relined a damaged 24-inch industrial drain that was taking in sand and rock.

The 18-story Beach Club condominium tower in Naples, Florida
Naples, Florida

We planned the restoration of 69 sewer stacks in an occupied 18-story tower.

Courtyard of the Ringling Museum of Art in Sarasota, Florida
Sarasota, Florida

We cleaned and camera-inspected the drains across a working museum campus.

Front of the Orlando Family Center on Mills Avenue in downtown Orlando
Orlando, Florida

We cleaned and lined more than 300 feet of main sewer with overnight work, excavated and replaced the cleanouts, and vapor-tested for the reported sewer gas.

Tell us about your building's stacks, risers or mains, and we will discuss the inspection your pipes need.
Get Sewer Help
Tell us what your line is doing. We call you back.
Four quick answers and we take it from there.





    We call you back within one business hour, Monday to Friday 7am to 7pm. We never share your information.

    Talk to our team
    Call anytime to schedule service or ask questions
    BBB logo
    Insured and bondable, A+ rating through top-rated carriers
    Blue Works Company FL State Lic. CFC1433187 | CGC1536940 | CMC1251435