Home / Past Projects / FPL industrial drain
| Property | FPL nuclear power plant, Florida |
|---|---|
| Pipe | 24-inch corrugated metal storm and process water drain, main retention pond to exfiltration |
| Carried | Storm and process water |
| Condition | Holes in the deteriorated wall admitting sand and rock |
| Method | Air inversion CIPP liner, steam cured in place |
| Schedule | Staged over multiple days; liner inversion in under an hour, 90 minute cook time |
The corrugated-metal line carried storm and process water. Holes in its deteriorated wall were letting rock and sand into the drain, so we adapted our preparation to the condition of the host pipe before we lined it.
Blue Works repaired a 24” Corrugated Metal Storm & Process Water Drain from the Main Retention Pond to Exfiltration using trenchless pipelining technologies.
After Years of Water Inverted Liners Cured with Boiler Cure, Air Inversion with Ambient Cure & Cementitious Mortar Spin Casting, Blue Works Acquired a Turn Key, Mid-Large Diameter Air Inversion CIPP Liner Shooter & Steam Curing System, allowing for CIPP Liner Inversion in less than an hour & a 90 Minute Cook Time, to complete the CIPP Liner Installation in an 8 Hour Day.
We staged access and prepared the deteriorated pipe for lining.
We changed lining direction where the run required it and inverted the liner.
We steam-cured the liner in place inside the corrugated host pipe.
We completed a final inspection of the relined drain.
The crew and before and after photographs above come from our January 2016 project report.
We planned the restoration of 69 sewer stacks in an occupied 18-story tower.
We cleaned and camera-inspected the drains across a working museum campus.
We cleaned and lined more than 300 feet of main sewer with overnight work, excavated and replaced the cleanouts, and vapor-tested for the reported sewer gas.
We identified 19 stacks for rehabilitation and inspected, cleaned and repaired about 1,300 feet of pipe, combining lining with partial replacement.