Blue Works Partial Project Reference List New

Past projects

Projects Reference List

Our record

✓ Blue Works is here to serve large projects nationally.

Blue Works has worked on 100,000 linear feet of piping throughout Florida. View our partial project reference list below. Please contact us directly for more references, testimonials or to book a consultation.

Reference projects
Each entry states the building, its year and the scope documented for that job.
01

NUCLEAR POWER PLANT

Built in 1976, FL
CIPP lining 24” RCP storm drains.

02

LUXURY HOTEL – 8 Stories, 529 Units

Built in 1988, FL
Inspected, cleaned and restored over 3,000 LF of sovent sanitary stacks with minimal access and little or no interruption to guests.

03

HIGH RISE HOTEL – 24 Stories, 398 Units

Built in 1991, VA
Inspected, cleaned and restored over 5,300 LF of cast iron sovent sanitary riser stacks.

04

SKYSCRAPER – 55 Stories, 445 Units

Built in 2008, NJ
Inspected, cleaned and restored over 2,000 LF of sanitary sovent riser stacks.

05

HIGH RISE CONDOMINIUM – 4 Towers, 18.5 Stories, 836 Units

Built in 1980, FL
CIPP lining of 15,200 LF of sanitary riser stacks and underground mains approx. 1,000 LF, including bypass of an entire tower to service the underground.

06

HOSPITAL – 5 Stories, 583 Beds

4 Interconnected Buildings, Built in 1973, FL
CIPP lining underground mains and laterals approx. 20,000 LF of piping, containment, surgery center, all while fully operational.

07

MEDICAL FACILITY – 85 Acers, 288 Beds

Built in 1993, FL
CIPP lining over 1,000 LF of kitchen sanitary underground 4” and 6” cast iron piping overnight.

08

MOBILE HOME PARK – 64 ACERS

Built in 1954, FL
CIPP lining underground mains and laterals approx. 5,800 LF of piping.

09

MID-RISE CONDOMINIUM – 12 Stories, 255 Units

Built in 2005, Washington, DC
Inspected, cleaned and restored cast iron sanitary sovent riser stacks and upper floor unit laterals, (after several unsuccessful attempts by previous contractors).

10

HIGH RISE CONDOMINIUM, 16 Stories, 197 Units

Built in 2006, MD
Inspected, cleaned and restored over 2,500 LF of sanitary sovent riser piping.

11

BEACHFRONT HOTEL, 7 Stories, 177 Units

Built in 1982, FL
CIPP lining 35 sanitary riser stacks and underground mains approx. 4,000 LF of piping without stopping operation or removing guests.

12

HOUSING AUTHORITY – 4 Stories, 100 Units

Built in 1985, FL
CIPP lining underground plumbing approx. 1,500 LF of piping, including excavation on the interior to repair collapsed piping.

13

APARTMENT BUILDING – 7 Stories, 180 Units

Built in 1973, FL
CIPP lining sewer riser stacks, relining of approx. 3,300 LF of piping.

14

CONDOMINIUM – 8 Stories, 57 Units

Built in 1954, FL
CIPP lining and pipe replacement of 32 sanitary riser stacks and clean underground approx. 3,200 LF of piping.

15

BEACHFRONT HIGH RISE – 16 Stories, 125 Units

Built in 1976, FL
CIPP lining sanitary riser stacks and underground mains approx. 7,800 LF of piping to include utilities and extended bath branch laterals.

16

CONDOMINIUM – 7 Stories, 94 Units

Built in 1975, FL
CIPP lining 120 sanitary riser stacks and underground mains approx. 7,250 LF of piping, including excavation on the exterior of the buildings to repair broken piping.

17

VILLA COMMUNITY – 3 Stories, 264 Units

12 Buildings, Built in 1970, FL
CIPP lining underground mains and laterals approx. 3,000 LF of piping

18

CO-OP BUILDING, 4 Stories, 160 Units

Built in 1973, FL
CIPP lining 72 sanitary riser stacks approx. 3,000 LF of 2” and 3” cast iron piping. 

19

GOLF COMMUNITY, 4 Stories, 136 Units

Built in 1973, FL
CIPP lining 109 sanitary riser stacks, rainwater leaders and underground mains approx. 4,500 LF of piping.

20

HIGH-RISE CONDOMINIUM – (2) 30 Story Towers, 227 Units

Built in 1990, FL
Inspected, cleaned and restored over 13,000 LF of cast iron sanitary sovent riser stacks and pipe replacement, (after several unsuccessful attempts by previous contractors).

21

DEPARTMENT OF TRANSPORTATION

CIPP lining underground storm piping over 1,000 LF of 42”, 30” and 24”.

22

MID-RISE CONDOMINIUM – (2) 12 Story, 100 Units

Built in 1968 & 1964, FL
CIPP lining 35 sanitary riser stacks and underground mains approx. 4,250 LF of piping, including repair to broken piping.

23

HIGH SCHOOL – 2 Buildings, 2 Stories

Built in 1953 & 1980, FL
CIPP lining underground plumbing approx. 1,500 LF of piping.

24

AUTOMOTIVE DEALERSHIP – 3 Stories, 15 Acers

Built in 1972, FL
CIPP lining underground mains and laterals.

25

CORRECTIONAL FACILITY

Inspect, clean and line CIPP storm collection system.

26

PORT AUTHORITY

Cleaning of over 500 LF of bulk handling troths and close to 5,000 LF of 6” and 10” carrier pipes in a 100% dry containment. 

27

APARTMENT BUILDING – 13 Stories, 300 Units

Built in 1970, FL
Inspect, clean and CIPP lining over 4,000 LF of sanitary riser stacks and underground piping.

28

HIGH RISE CONDOMINIUM, 25 to 30 Stories, 254 Units

Built in 2006, MD
Inspected, cleaned and restored over 15,800 LF of sanitary sovent riser piping.

More project records
Trusted where failure isn't an option.
Blue Works crew in hard hats and fall-protection harnesses at an open drain grate at the FPL industrial drain
Florida nuclear facility

We relined a damaged 24-inch industrial drain that was taking in sand and rock.

The 18-story Beach Club condominium tower in Naples, Florida
Naples, Florida

We planned the restoration of 69 sewer stacks in an occupied 18-story tower.

Courtyard of the Ringling Museum of Art in Sarasota, Florida
Sarasota, Florida

We cleaned and camera-inspected the drains across a working museum campus.

Front of the Orlando Family Center on Mills Avenue in downtown Orlando
Orlando, Florida

We cleaned and lined more than 300 feet of main sewer with overnight work, excavated and replaced the cleanouts, and vapor-tested for the reported sewer gas.

Facade of the six-story Jacksonville retirement and assisted living building
Jacksonville, Florida

We identified 19 stacks for rehabilitation and inspected, cleaned and repaired about 1,300 feet of pipe, combining lining with partial replacement.

Tell us about your building's stacks, risers or mains, and we will discuss the inspection your pipes need.
Get Sewer Help
Tell us what your line is doing. We call you back.
Four quick answers and we take it from there.





    We call you back within one business hour, Monday to Friday 7am to 7pm. We never share your information.

    Talk to our team
    Call anytime to schedule service or ask questions
    BBB logo
    Insured and bondable, A+ rating through top-rated carriers
    Blue Works Company FL State Lic. CFC1433187 | CGC1536940 | CMC1251435